Each media event has to stand on its own, and that depends on the route from arrival to every photo point working as one piece. The installations go up early and the floor keeps running. Production has to hold the timetable and still give the cameras something worth shooting.
Hotel PR · On-site production of the media events
Let the city become the venue
Conrad Chongqing
Project / seriesConrad Chongqing opening project

Four photo points — the waterfall installation, the wooden sign, the tea counter at the entrance and the custom installation on the central terrace — were each built to stay in place for ten days. The two events ran on the same routing and the same crew schedule, with photography and post-production delivered alongside.
- Four media photo points built to stay in place for ten days, including the waterfall court and the central-terrace installation
- On-site production and routing for two media events
- Six days of on-site photography and post-production across the two events, three photographers and a shared cloud gallery
RoleBuild and on-site execution of the media photo installations.
RESULTS
40,939,104Total impressions across the two events
44,516Total interactions across the two events
10 daysContinuous life of the waterfall photo installation
SourceRUI MEDIA project report, Conrad Chongqing Media Event Report, pp. 14–16, 26, 74 — impressions and interactions are the combined totals of two events, not split per event, and the report carries no platform screenshots.